The bike is coming along nicely and Dad is doing a great job of the preparation work. Since the last post the following have been done;
- Mounting points have been braised on for the tank and exhaust
- Shims have been turned and fitted in the headstock to allow the taped roller bearings to fit correctly
- Pattern made for the footrest hangers and sent off to be lazer cut from 6mm sheet
- Frame has gone to powder coaters
- Bash plate has been fitted
- Clutch fitted and belt obtainjed from Nigel Bower at NEB
- Mag fitted
- The damaged fork leg has been welded up where it was damaged at the mudguard stay mounting point by Bully and that has been collected and milled, shaped, drilled, tapped and polished so it's ready to go again
Todays pics are of the engine with the beautiful clutch fitted and just waiting for a powder coated frame to come and wrap itself around it. Should be back by the weekend so we can start showing some pictures of the build as it takes shape.
No comments:
Post a Comment